Project Overview
Replaced a failing roof on Trailway Rd SE in Huntsville, Alabama to restore protection and curb appeal after storm damage and age-related leaks. Dr. Roof removed deteriorated shingles, upgraded underlayment and ventilation, and installed high-performance materials to improve weather resistance, attic ventilation and energy efficiency, important for Alabama’s hot, humid summers and severe storms.
Results
The new roof delivered immediate, visible improvements: clean lines, uniform weathered wood color, and watertight protection where leaks had occurred. Upgraded underlayment, ice and water shield in vulnerable areas, and new flashing reinforced roof integrity against heavy rain and wind. Ventilation was improved with multiple ridge vents and power vents, reducing attic heat buildup and lowering cooling demand in summer. Dr. Roof completed decking repairs and used durable metal flashings to extend service life, and the installation is supported by manufacturer-backed materials plus Dr. Roof’s workmanship guarantee for homeowner peace of mind.
Materials Used
This Roof Replacement at Trailway Rd SE in Huntsville, Alabama was completed by Dr. Roof.
High-quality materials and careful craftsmanship left the homeowner satisfied with improved curb appeal, stronger weather resistance, and better attic ventilation.
- 64.33 sq GAF Timberline HDZ shingles, Weathered Wood
- 7 rolls Tri-Build underlayment
- 6 bundles Tri-Build starter shingles
- 23 bundles GAF Seal-A-Ridge, Weathered Wood
- 7 rolls Tri-Build ice & water shield
- 1 box 1¼" aluminum nails
- 1 roll Liberty cap sheet, Weathered Wood modified bitumen
- 54 pcs 10' x 4" x 2" black drip edge (eaves)
- 10 pcs 10' x 4" x 2" black drip edge (rakes)
- 4 boxes 1¼" coil roofing nails
- 4 boxes button cap nails
- 9 pipe boots 3-in-1 w/ rain collar, black
- 35 Tri-Build ridge vents
- 3 power vents
- 1 roll 25' galvanized rolled flashing (24")
- 1 box 2x4x8 26ga black step flashing
- 1 pc 4x4 black headwall flashing
- 2 pcs 5" black counter flashing
- 10 tubes NP1 black
- 1 tube Ultra Karnak 19
- 15 boards OSB decking
- 3 cans black spray paint